Facilities Management
Our听 goals reflect those of the 糖心Vlog Strategic Plan as follows:
Goal 6: 听Enhancing The Physical Environment
糖心Vlog will create a physical environment that fosters learning and promotes cultural and social interaction among the University鈥檚 diverse communities.
OBJECTIVE 1: 听 Provide functional and attractive physical facilities with technologically appropriate infrastructure to support the University鈥檚 academic and collegiate programs.
OBJECTIVE 2: 听 Provide resources necessary to maintain all current and future facilities in order to manage maintenance proactively.
OBJECTIVE 3: 听 Review and update a comprehensive facilities master plan to ensure consistency with the University鈥檚 strategic plan.
OBJECTIVE 4: 听 Create a 鈥渟ense of place鈥� through architectural vocabulary and by developing public gathering places (both interior and exterior), open spaces and collegiate campus neighborhoods to facilitate faculty and student interaction.
OBJECTIVE 5: 听 Plan and develop residential and student support areas that foster collegial communities for both undergraduate and graduate students.
OBJECTIVE 6: 听 Provide and promote efficient, safe, and accessible transportation systems that improve the flow of vehicle and pedestrian traffic on all campuses.
OBJECTIVE 7: 听 Maximize utilization of instructional facilities.听
Assistant Vice President - Facilities Management
Staff Directory
TBD
Assistant Vice President Facilities Management
Azita Dotiwala,听
Senior Director, Budget and Planning听
(561) 297-0425
dashtaki@fau.edu
Corrine Okun,听
Administrative Services Manager
(561) 297-2663
cgarwood2012@fau.edu
Mailing Address
Facilities Management
糖心Vlog
777 Glades Rd.
Building 69, Room 101
Boca Raton, FL 33431-0991
Phone: 561-297-2663
Fax: 561-297-0224
Assistant Vice President听
We believe our first responsibility is to the students, faculty, staff and all others who visit any of our Campuses or utilize our services. The Mission of Facilities Management is to protect the good name of 糖心Vlog by providing and maintaining a physical environment that is conducive to an enriching academic experience. View our听full mission statement, vision and values.
Announcements
Approved Facilities Programs
The following list includes programs for facilities that are currently being planned.听 This list is sorted with the most recent on top.听 Those facilities above the line are currently in process of Architect/Engineer or Construction Manager Selection.听 Those below the line are recent projects where selections have now been finalized and are either in the design phase or under construction.
NEW
- BT690 - Wallach Institute for Holocaust & Jewish Studies
- BT686 - Student Union Expansion & Renovation Program
- Charles E. Schmidt College of Medicine - Office Building - BT - 676
- 糖心Vlog Breezeway Renovation & Repairs Project - BT-635
- 600 Bed Residence Hall
- Boca Raton Campus Parking Garage III
- Florida Atlantic Blvd Northern Four Lane-Scope of Work
-
糖心Vlog/HBOI Research Laboratory II
糖心Vlog/HBOI Link Building Renovation - 糖心Vlog Stadium Amended September 8, 2008 听 糖心Vlog Stadium Appendix
- A.D. Henderson University School Classroom Expansion
- Innovation Village Apartments Phase I - 600 Bed Facility
- General Classroom Building - Boca Raton Campus
-
Multi-Media Studies Theatre (Combined with General Classroom)
- 糖心Vlog / UF Joint Use Facility - Davie Campus
- Port St. Lucie Partner Campus - Classroom Facility
- College of Engineering and Computer Science
- MacArthur Campus Parking & Roadways - Scope of Work
- 糖心Vlog Alumni Center
- COB / Office Depot Center for Executive Development - Amendment #1
- Boca Raton Campus Recreation & Wellness Center
- Computer Center Expansion & Renovation
- Davie Campus Student Activity Center
A/E and CM Advertisements
- A/E Professional Qualification Supplement Form
- Construction Manager Qualifications Supplement Form
- Approved Facilities Programs
- Standard CM Continuing Services Contract
- Standard AE Continuing Services Contract
Current Advertisements:听听
Civil Engineering Continuing Services
- Civil Engineering - Selected Firms - New
- Civil Engineering - Shortlisted Firms听
- Civil Engineering - Firm Submissions听
- Advertisement听
- Public Notice - Updated 6/10/2025
- Project Fact Sheet - Updated 6/10/2025
Mechanical / Electrical / Plumbing (MEP) Engineering Continuing Services
- Selected Firms - New
- MEP - Shortlisted Firms - New
- MEP - List of Applicants听
- Advertisement听
- Public Notice听- Updated 01-07-2025
- Project Fact Sheet - Updated 01-07-2025
Recent Selections:听听
Construction Management Continuing Services
Architecture/Engineering Continuing Services
BT686 Student Union Expansion听
BT640 - 2026 Campus Student Housing听听
BT690 - Wallach Institute for Holocaust & Jewish Studies
Code Review and Inspection Services - Continuing Services Contract
Civil Engineering - Continuing Services
Mechanical / Electrical / Plumbing (MEP) Engineering Continuing Services:
AVP Policies & Procedures
The following Polices and Procedures are approved for use in the AVP office.
- FM-1 Reserved
- FM-2 Selection Committee Appointment for AE and CM Services (Major & Minor Projects)
- FM-3 Reserved
- FM-4 Selection and Approval of Exterior Building Colors
- FM-5 Reserved
- FM-6 Reserved
- FM-7 Submittal, Review and Adoption of Campus Master Plans and campus Master Plan Amendments
- FM-8 Reserved
- FM-9 Development of Facility Programs
- FM-10 Advertisement for Selection of Architect/Engineer (Major & Minor Projects)
- FM-11 Selection Process for Architect/Engineer (Major 听& Minor Projects)
- FM-12 Advertisement for Selection of Construction Manager (Major & Minor Projects)
- FM-13 Selection Process for Construction Manager (Major & Minor Projects)
- FM-14 Administration of Agreement Between Owner & Architect/Engineer
- FM-15 Administration of Agreement Between Owner & Construction Manager and Contract Amendment to establish Guaranteed Maximum Proposal (GMP)
- FM-16 Reserved
- FM-17 Filing System for Documentation of Major BT Projects (A/E & CM)
- FM-18 Reserved
- FM-19 Annual Minor Project Fixed Capital Outlay
- FM-20 Reserved
- FM-21 Reserved
- FM-22 Reserved
- FM-23 Reserved
- FM-24 Reserved
- FM-25 Infrastructure Drawings
- FM-26 Reserved
- FM-28 Padlock Keying System